AL MASJID AL HARAM MATAF EXPANSION
Location
Saudi ArabiaTotal Area
6,000 m² @ 2mmCoating System
DELTAPrime 2K SD Primer
DELTAShield HP 400
DELTAShield F 100 FR
Client
Masjid al-HaramDate
2022Summary
The Saudi Authorities had decided to expand and refurbish the Masjid Al Haram Mataf area. This included renovation of the ottoman era domes. DELTAShield HP 400 was specified for the application. The requirement was to have a fire rated top coat for the system; DELTAShield TC 100 FR was applied as a pure white top coat. DELTAPrime 2K SF was used for the primer base coat.